Skip to page body Home Residents Businesses Visitors Government Services Departments I Want To...

Required Construction Permits:
The following Construction Permits are required unless specifically exempted by the Fire Code:

Access Control Systems:

Automatic Fire-extinguishing Systems:
Exception: When the work only affects fewer than ten (10) sprinklers.

Battery Systems:

Fire Alarm and Detection Systems and Related Equipment - [Updated 12/05/2016]:

Exception: When the work only affects fewer than 5 notification appliances affected, firmware/software updates, replacing boards of the same model with chips utilizing the same or newer firmware. 

A fire alarm permit is also not required when ONLY adding new supervision of a hood suppression system to an existing fire alarm panel, however, the installing fire alarm licensee must be present during hood suppression acceptance testing to test the supervision.

Fire Pumps and Related Equipment:

Flammable and Combustible Liquids:

Industrial Ovens:

LP-gas:

Private Fire Hydrants:

Spraying or Dipping:

Standpipe Systems:

Required Operational Permits:
The following operational permits are required, unless specifically exempted by the Fire Code:

Display, Operate or Demonstrate Liquid- or Gas-fueled Vehicles or Equipment in Assembly Buildings:

Fireworks / Use of Pyrotechnics Before a Proximate Audience:

Hazardous Materials:

Hazardous Materials Transportation:

Open Burning:

Security Gates Across Fire Lanes:

Storage and Use of LP-gas:

 "Tents": Temporary Membrane Structures and Tents Operational Permit Application and Policy:

Last updated: 12/6/2016 3:29:23 PM